Principal – Roadtek (Department of Transport Main Roads)
Project Location – M1 | M3 Merge
Project Scope – Pavement Design, Geotechnical Design, Engineering Survey and PUP Infrastructure Design, Base Design Model Development, Project Management, Pavement Engineering and Factual Reporting with Design Recommendations
AHS acted in role of Principle contractor to undertake all survey works required by TMR to create a reference design model. AHS submitted AutoCAD, 12 da files and survey supporting for TMR to use directly in their design. All works were undertaken in accordance with TMR survey standards. A comprehensive 12da model of all features and key PUP infrastructure was provided for 5km of motorway and associated adjacent road networks.
Some individuals and businesses still make common cardboard recycling mistakes that can hamper the process
Read moreMetals, such as steel, aluminium, and copper, are among the most valuable and widely used materials in the world.
Read moreIn recent years, technology has started to play a crucial role in transforming how we manage waste.
Read moreOur friendly operators are available at the AWRC if you need to clarify any further information.