GCLR Stage 2 – Southern Section PUP Investigation

Principal – TMR
Completion Date – September 2015

Project Scope – To undertake an investigation of existing utility services for a proposed route of the southern section of Stage 2 of the Gold Coast Light Rail

The PUP investigation adopted a two stage process with the initial stage requiring cable locating and GPR and also pothole and strip trench locating. Undertaking the initial stage aimed at improving efficiency and also identifying utility services that were not shown on the provided project plans. It was evident from undertaking this process that hydro excavation via potholing with some strip trenches would be required. Strip trenches were a necessity due to the number of utility services in each location and the small amount of separation between the utility services. By undertaking strip trench methodology a larger area was investigated therefore providing a more detailed investigation.

Related Posts

  • Cardboard boxes

    Common Cardboard Recycling Mistakes to Avoid

    Some individuals and businesses still make common cardboard recycling mistakes that can hamper the process

    Read more
  • Various discarded items made of metal

    Metal Recycling: The Untapped Potential of Scrap Metal

    Metals, such as steel, aluminium, and copper, are among the most valuable and widely used materials in the world.

    Read more
  • Two smart bins

    Smart Bins and the Future of Industrial Waste Management

    In recent years, technology has started to play a crucial role in transforming how we manage waste.

    Read more
  • Adelaide Waste and Recycling Centre

    Our friendly operators are available at the AWRC if you need to clarify any further information.

    08 8295 5077