Principal – TMR
Completion Date – September 2015
Project Scope – To undertake an investigation of existing utility services for a proposed route of the southern section of Stage 2 of the Gold Coast Light Rail
The PUP investigation adopted a two stage process with the initial stage requiring cable locating and GPR and also pothole and strip trench locating. Undertaking the initial stage aimed at improving efficiency and also identifying utility services that were not shown on the provided project plans. It was evident from undertaking this process that hydro excavation via potholing with some strip trenches would be required. Strip trenches were a necessity due to the number of utility services in each location and the small amount of separation between the utility services. By undertaking strip trench methodology a larger area was investigated therefore providing a more detailed investigation.
Managing waste at events with large gatherings demands careful planning. Whether it’s a party, concert, festival, or any public gathering, Adelaide Waste and Recycling Centre offers assistance in waste management and reduction strategies.
Read moreA pioneering technology set to revolutionise fuel efficiency and curb emissions from large diesel engines is poised for nationwide implementation, thanks to a partnership between its creator, HYDI, and waste management company Solo Resource Recovery.
Read moreThe City of West Torrens, in collaboration with Dryclone Australia (a subsidiary of Solo Resource Recovery), Peats Soil and Garden Supplies, and Greenhill Energy, has joined forces to explore the possibilities of a circular economy by utilising Municipal Solid Waste for hydrogen production through gasification.
Read moreOur friendly operators are available at the AWRC if you need to clarify any further information.