Principal – Roadtek (Department of Transport Main Roads)
Project Location – M1 | M3 Merge
Project Scope – Pavement Design, Geotechnical Design, Engineering Survey and PUP Infrastructure Design, Base Design Model Development, Project Management, Pavement Engineering and Factual Reporting with Design Recommendations
AHS acted in role of Principle contractor to undertake all survey works required by TMR to create a reference design model. AHS submitted AutoCAD, 12 da files and survey supporting for TMR to use directly in their design. All works were undertaken in accordance with TMR survey standards. A comprehensive 12da model of all features and key PUP infrastructure was provided for 5km of motorway and associated adjacent road networks.
Where you have many people congregating in one place, you will need to put some thought into how waste is managed.
Read moreA device designed to save fuel and slash emissions from large diesel engines will be rolled out across the country following an agreement between its developer and waste- management company Solo Resource Recovery.
Read moreCity of West Torrens with Dryclone Australia (a subsidiary of Solo Resource Recovery), Peats Soil and Garden Supplies, and Greenhill Energy have collectively agreed to investigate the circular economy potential for using Municipal Solid Waste to produce hydrogen from gasification.
Read moreOur friendly operators are available at the AWRC if you need to clarify any further information.